EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request

EIA Summary

  • Toggle
    • EIA Summary
    • CEC
    • APPLICANT
    • CONSULTANT
    • DESCRIPTION
  • Group by
    • None
    • CEC
    • APPLICANT
    • CONSULTANT
    • DESCRIPTION
  • Clear filters
  • Advanced search
CEC APPLICANT CONSULTANT DESCRIPTION
Page 10 of 20
  • Start
  • Prev
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • Next
  • End
No records
1325/2006 Petro-CanadaTrinidad and Tobago Block 1 (b) Coastal Dynamics To drill three (3) exploration wells at Block 1(a), offshore, Gulf of Paria, Trinidad.
View
1321/2006 Ministry of Works and Transport. Project Implementation Unit, Highways Division. Ecoengineering Consultant Ltd. The construction of a new highway to Point Fortin as an alternative to the existing Southern Main Road. The extension runs through the southwest peninsula, from St. Mary's Junction to Point Fortin.
View
1305 / 2005 The establishment of a small scale gas-to liquids plant for the conversion of gas reserves into zero sulphur, high cetane diesel, naphatha and LPG at Pointe-A-Pierre refinery, Pointe-A-Pierre.
View
1283 / 2005 National Energy Company Coastal Dynamics Ltd. Establishment of harbour, port and marine terminal inclusive of associated works at Isthmus Road, Galeota
View
1268 / 2005 EOG Resources Trinidad Ltd, Continental Shelf Associates Ltd. Drilling and Completion of two (2) additional production wells, offshore
View
1263 / 2005 National Energy Corporation of Trinidad and Tobago Limited Lee Young and Partners Consulting Engineers and Project Managers Clearing, Laying of Pipline Establishment of Infrastructure Distribution of Potable Water, Point Lisas
View
1260 / 2005 Venture Production (Trinidad) Ltd. (VPTL) Environmental Sciences Ltd. To conduct drilling operations in the Tabaquite Field.
View
1254 / 2005 Methanol Holdings (Trinidad) Ltd., Ecoengineering Consultant Ltd. Establishment of a Facility for petroleum products, petrochemical products, Point Lisas
View
1248 / 2005 Essar Steel Caribbean Ltd.; Senes Consultants Ltd. To conduct infrastructural works (clearing grading and backfilling of 203 hectares of land for the construction of an integrated steel complex at Point Lisas Industrial Estate, Point Lisas.
View
1239 / 2005 BP Trinidad and Tobago LLC. (BPTT) Environmental Sciences Ltd. To develop the Cashima and NorthEastQueenBeach reserve by the installation of a Cashima Well Protector Platform (WPP) the pipeline and the drilling of the wells in the East Mayaro Block.
View
  • You are here:  
  • Home
  • EIA Summary

Back to Top

© 2023 EMA E-Summary