Print
CEC Summary
7005/2024
2024-12-24
Heritage Petroleum Company Limited 1
27
The replacement of 4.92 km (16,150 ft) of corroded sections of the 10-inch diameter underground crude oil pipeline from the Cunjal Manifold to the Barrackpore tank farm
Cunjal to Barrackpore
CEC ISSUED 28-January-2025