Print
CEC Summary
6855/2024
2024-04-03
Water and Sewerage Authority (WASA)
38 (b), 40 (b)
The drilling, developing and equipping of the Wallerfield #20 well for production status at L.P. No. 17 Hamilton siding and the installation of 1.543 km of a 150-MM poly vinyl chrolride pipeline, inclusive of associated appurtenances, from the proposed Wa
Wallerfield
CEC ISSUED 22-May-2024