Print
CEC Summary
6853/2024
2024-04-03
Water and Sewerage Authority (WASA)
38 (b), 40 (b)
The Drilling, Developing and equipping of Talparo #2 well for production status and the installation of 2.28KM of 150MM vinyl chloride pipeline inclusive of associated appurtences from the proposed Talparo #2 well to the Talparo water treatment plant alon
Talparo
CEC ISSUED 20-May-2024