Print
CEC Summary
6826/2024
2024-02-27
The Ministry of Works and Transport (MOWT)
13 (a)
The modification of an existing 401-meter Seawall, inclusive of establishment of Armour Rock toe protection and a 50-meter Armour Rock revetment in the vacinity of the 71.7 Km, Mark Paria Main Road.
Paria Main Road
Clarification Letter 14-June-2024