Print

CEC Summary

6761/2023
2023-10-19
Perenco T&T Limited
24, 27
The installation of a 200-meter, 10-inch oil pipeline with a pig receiver to connect to the 10-inch export pipeline for tie-in to bpTT’s Galeota Terminal Facility
bpTT Terminal Facility - Point Galeota, Guayaguayare, Mayaro
CEC ISSUED 09-November-2023