Print
CEC Summary
6656/2023
2023-05-15
Ramps Logistics Limited
36
The modification and expansion of a facility for the storage of chemicals by the construction of a chemical bund of 241.56 squares metres (m2) and a chemical shed of 483.12 m2, to replace the existing chemical storage bund of 240.25 m2
Bowen Marine, Marine Western main Road, Chaguaramas
CEC ISSUED 01-September-2023