Print

CEC Summary

6411/2022
2022-04-12
WASA
38(b), 40(b)
Drilling, developing and equipping of the Cumuto #4 Well for production status and the laying of 1.695km of 200mm diameter transmission pipeline and associated appurtenances.
68m west of LP WAL-SGE 00014, Cumuto Road, Cumuto
CEC ISSUED 10-June-2022