Print
CEC Summary
6407/2022
2022-04-08
Heritage Petroleum Company Limited
27(a)
The Replacement of 11811 feet (3.6km) of 4 inch production pipeline between WD15 to WD6
Carapal Area , Palo Seco
CEC ISSUED 13-Apr-2022