Print

CEC Summary

6295/2021
2021-10-06
BP Trinidad and Tobago LLC (BpTT)
27
The conduct of Geotechnical Survey within the existing bpTT right-of-way corridor for bpTT's 6 inch condensate pipeline between bpTT's Beachfield and Galeota Terminal onshore facilities
Galeota Point and Beachfield
CEC ISSUED 31-Mar-2022