Print
CEC Summary
6274/2021
2021-09-02
Heritage Petroleum Company Limited
27
Installation of a Six (6) Inch Diameter Pipeline (2300 meters in length) from Proposed
Well S878FU3 to Platform 20 in the East Soldado Field. Refer to Annex 3 - Project
Description.
Well S878FU3 to Platform 20 in the East Soldado Field. Refer to Annex 3 - Project
Description.
NA-OFFSHORE ( Refer to Annex 1 - Drawing of Pipeline Route)
Application Withdrawn 9-Feb-2022