Print
CEC Summary
6241/2021
2021-06-09
BPTT
27
The 6-inch Beachfield to Terminal Pipeline Contingency Project: Installation of a new temporary 6” pipeline from the Beachfield facility liquid outlet to the
6” Heritage pipeline.
6” Heritage pipeline.
Onshore north of Beachfield Terminal Facility, Guayaguayare The coordinates of the
facility are: 1121364.183 N and 711591.621 E
facility are: 1121364.183 N and 711591.621 E
CEC ISSUED
25-Jun-2021