Print

CEC Summary

6095/2020
2020-09-30
The National Gas Company of Trinidad and Tobago Limited (NGC)
8(a)(b), 27
the establishment of an 8-inch Natural Gas pipeline, 2km in length, to connect to the Natioanl Gas Company of Trinidad and Tobago Limmited's (NGC's) existing 30inch pipeline and the upgrade of the NGC's Poole Valley Valve Station to include a metering sta
Poole Valley Road, Rio Claro
Clar. L. Emailed 24 Nov 2021 Resp. to Modification of Scope of Works 26-Mar-2021