Print
CEC Summary
6041/2020
2020-07-21
BPTT LLC
20 (c)
the establishment of a 2.5km access road to facilitate a portable temporary smartpipe factory for the installation of a non metallic High Density Polyethylene (HDPE) liner within the existing 152.4mm pipeline
between Galeota Point and Beachfield
CEC ISSUED
24-May-2021