Print

CEC Summary

5949/2020
2020-01-27
Water and Sewerage Authority (WASA)
38(b), 40(a)
the drilling, development and equipping of the Aripo #2 wells for production status and the installation of 0.6km of a 100-mm diameter transmission pipeline and its appurtenances
Unnamed Street, Off
Aripo Main Road, Aripo
CEC ISSUED 19-Mar-2020