Print

CEC Summary

5863/2019
New Horizon Exploration Trinidad and Tobago Unlimited
29, 36
the installation of five(5), 500 barrel movable frac tanks for the storage of produced water to be used in well intervention works and the storage of crude oil
GU1 Facility, GU1 Block, Guapo, Point Fortin
CEC ISSUED 22-Nov-2019