Print
CEC Summary
5846/2019
2019-08-19
Water and Sewerage Authority (WASA)
38(b)
the drilling, development and equipping of four (4) water wells for production status including three (3)100-mm pipeline, 0.065km in length,one (1) 100-mm pipeline, 0.03km in length and assosicated appurtenances
Oropune, Piarco
CEC ISSUED
15-Nov-2019