Print

CEC Summary

5794/2019
API Petroleum Company Limited
40(a)
construction of a 400 feet of 6.75 inch diameter pipeline to supply water to six fire monitors to be installed
gathering station No. 8, #16-22 Hyperworks Road, La Fortune, Woodland
NO CEC Required 16-Jul-2019