Print

CEC Summary

5788/2019
2019-06-18
Water and Sewerage Authority (WASA)
38(b), 40(a)
drilling, developing and equipping of the Chatham #18 Well for production status and the installation of 1.2km of 100mm PVC transmission pipeline and its appurtenances
Bobby Trace, Chatham
CEC ISSUED 04-Oct-2019