CEC Summary

5669/2019
2019-02-01
WASA c/o Roger Karim
38(b), 40(b)
the drilling, developing and equipping of two (2) water wells for production status including two (2) 150mm pipeline, 0.05km and 0.15km in length respectively and associated appurtenances.
Hololo Road Santa Cruz#10
Cantaro Extension Road Santa Cruz #11
CEC ISSUED 31-May-2019