Print

CEC Summary

5539/2018
2018-08-09
Carib Glassworks Limited
20(c)
The replacement of the existing furnace at plant 1 for the manufacture of glass products
Carib Glassworks Limited, Eastern Main Road, Champs Fleurs
NO CEC Required 28-Sep-2018